Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization
Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization  
Home Click for more info...
 
Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization


Case Studies - Logistics

Solution: Evaluating new equipment and processes
One example of how Delta has used PROMODEL predictive technology has been in the evaluation of new equipment for transporting planes. At one time they used a dedicated "tug" vehicle at each gate, and so they looked at investing in new tugs that could be cross-utilised, risking delaying some flights waiting for a tug. Analysis of the highly variable system was completed and recommendations were made that invested in new tugs and developed an optimum system that saved Delta millions of dollars.





Case Studies Menu

  1. Automotive
  2. Aerospace
  3. Chemicals
  4. Engineering
  5. Food / Drink
  6. Oil / Gas
  7. Logistics
  8. Pharmaceuticals
  9. Finance