Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization
Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization  
Home Click for more info...
 
Process Modelling, simulation, business process, logistics, supply chain, strategic planning, sales and operations planning, scheduling, advanced planning and scheduling, APS, performance improvement, manufacturing simulation, lean manufacturing, Six Sigma, call centre, CRM, Waiting Times/Lists, Healthcare Improvement, waiting lists, waiting times, distribution, production, process improvement, production modeling, production modelling, productivity improvement, performance improvement, change management, promodel, servicemodel, consulting, continuous improvement, optimise, optimize, optimisation, optimization


Case Studies - Automotive

Solution : Evaluating new equipment and processes
We provided the modeling, manufacturing process analysis and recommendations needed for GM to make a critical launch decision that saved millions of dollars. GM and a tier-one supplier were uncertain whether a new manufacturing process design for a critical stage of the new vehicle would produce the desired jobs per hour. Our predictive technology modeled the new process and found that it would NOT by 30% because of an unexpected constraint. Our recommendations were implemented and the launch was saved. The supplier retained the PROMODEL custom software solution in order to make additional process improvements.


Solution : C
apacity analysis and improvement.
Paint lines are often a source of intense study and desired improvement - from auto companies, to motorcycle manufacturers and to Carrier Corporation, part of United Technologies. The PROMODEL predictive analysis software was used to accurately model their refrigeration equipment paint line and make some startling and valuable discoveries. Among the discoveries was finding that over $800K of throughput improvement projects planned for the plant would have little or NO impact on throughput. Instead, installing a new paint oven WOULD help and have an annual benefit of $370K. The decisions powered by PROMODEL technology resulted in savings to Carrier of over US$1 million.



Solution: Reducing inventory
Complex and highly variable manufacturing processes can't be accurately modeled with traditional spreadsheet techniques. Fiat found that a predictive technology solution powered by PROMODEL enabled them to accurately model their process and then reduce work-in-process inventory by 48%, reduce lead times and reduce space requirements. From the dozens of possible improvement initiatives, the software solution enabled them to identify specific plant scheduling changes and process improvements that resulted in a large return on investment and over US$1 million savings.



Solution: Transportation system design
Volkswagen relied on PROMODEL predictive technology to make major changes in their highly variable and complex vehicle distribution network. Savings were over US$20 million per year. A custom solution for their plant-to-distribution center-to-dealer delivery system was built using PROMODEL technology. Multiple improvements were identified and implemented. These included changing distribution center locations and subsequently replacing some expensive truck routings with cheaper rail or sea routes. Benefits to Volkswagen included both lower costs and improved customer service.